Production

Our enterprises are located in the Far Eastern Federal District in the Neryungri Region of the Republic of Sakha (Yakutia).

Coal mining

An important characteristic of the South Yakut coals is stable low content of sulphur, phosphorus, fluorine and other heavy elements.

Developed infrastructure of the region, accessibility to highways, railways and seaports allows to develop optimal logistics schemes for export trade.

Transport accessibility is provided by the federal highway - the Amuro-Yakutsk highway. The railway connects the enterprises with the Far Eastern ports through the BAM and Transsib. Coal transportation by sea is provided through own specialized terminal in Muchka Bay of the Khabarovsk.

We mine coal by open-pit and underground method.

GOK "Denisovskiy"

DENISOVSKIY Mining and Production Complex

Denisovskiy Complex develops the “Denisovskiy” coal deposit.

The Complex is an anchor resident of the “South Yakutia” Advanced Social and Economic Development Area.

Balance reserves are 226.4 mn tons

Denisovskiy includes:

  • Denisovskaya CHPP. Capacity — 6 mn tons of ROM coal per year
  • Denisovskaya u/g mine. 56.5 mn tons of coal reserves for underground mining.
    Production - 2 mn tons per year.
  • Denisovskaya Vostochnaya u/g mine. 169.5 mn tons of coal reserves for underground mining. Production – 4 mn tons per year.
  • Open-cut mining area. 3.5 mn tons of coal reserves for open-cut mining.

GOK "Inaglinsky"

INAGLINSKIY Mining and Production Complex

Develops the Chulmakan and Verkhne-Toluminskoye coal deposits (sites No. 1 and No. 2). Balance reserves are 767.8 mn tons.

Inaglinskiy includes:

  • Inaglinskiy open-cut mine.
  • Inaglinskaya-1 CHPP. Capacity — 2 mn tons of ROM coal per year.
  • Inaglinskaya u/g mine (ramp-up stage). 71.3 + 648.3 mn t coal reserves for underground mining
  • Inaglinskaya-2 CHPP, 1-st line. Capacity — 6 mn tons of ROM coal per year.

Prospective projects:

  • Inaglinskaya-2 CHPP, 2-nd line. Capacity — 6 mn tons of ROM coal per year
The Inaglinskaya mine is the largest in Russia.

Full production capacity for the production of coking coal grades is 12 million tons per year. Balance reserves are 653.2 million tons. The term of reserves development is 30 years.